IEC 62271-208:2025High-voltage switchgear and controlgear - Part 208: Methods to quantify the steady state, power-frequency electromagnetic fields generated by HV switchgear assemblies and HV/LV prefabricated substations, both for rated voltages above 1 kV and up to and including 52 kV
358.45 €
|
IEC 62271-214:2024/COR1:2025Corrigendum 1 - High-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
0.00 €
|
IEC TR 62271-307:2024 RLVHigh-voltage switchgear and controlgear - Part 307: Guidance for the extension of validity of type tests of AC metal and solid-insulation enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
609.90 €
|
IEC TR 62271-307:2024High-voltage switchgear and controlgear - Part 307: Guidance for the extension of validity of type tests of AC metal and solid-insulation enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
358.45 €
|
IEC TS 62271-318:2024High-voltage switchgear and controlgear - Part 318: DC gas-insulated metal-enclosed switchgear for rated voltages including and above 100 kV
406.60 €
|
IEC TS 62271-318:2024 EXVHigh-voltage switchgear and controlgear - Part 318: DC gas-insulated metal-enclosed switchgear for rated voltages including and above 100 kV
891.31 €
|
IEC 62271-211:2024High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV
171.20 €
|
IEC 62271-200:2021/AMD1:2024Amendment 1 - High-voltage switchgear and controlgear - Part 200: AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
42.80 €
|
IEC 62271-200:2021+AMD1:2024 CSV (Consolidated Version)High-voltage switchgear and controlgear - Part 200: AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
802.50 €
|
IEC 62271-214:2024High-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
278.20 €
|
IEC 62271-214:2024 CMVHigh-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
556.40 €
|
IEC 62271-214:2024 EXVHigh-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
691.22 €
|
IEC 62271-214:2024 EXV-CMVHigh-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV
1,102.10 €
|
IEC 62271-207:2023High-voltage switchgear and controlgear - Part 207: Seismic qualification for gas-insulated switchgear assemblies, metal enclosed and solid-insulation enclosed switchgear for rated voltages above 1 kV
278.20 €
|
IEC 62271-202:2022/COR1:2023Corrigendum 1 - High-voltage switchgear and controlgear - Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV
0.00 €
|
IEC 62271-209:2022 EXVHigh-voltage switchgear and controlgear - Part 209: Cable connections for gas-insulated metal-enclosed switchgear for rated voltages above 52 kV - Fluid-filled and extruded insulation cables - Fluid-filled and dry-type cable terminations
691.22 €
|
IEC 62271-204:2022 EXVHigh-voltage switchgear and controlgear - Part 204: Rigid gas-insulated transmission lines for rated voltage above 52 kV
782.17 €
|
IEC 62271-212:2022 RLVHigh-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV
691.22 €
|
IEC 62271-212:2022High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV
406.60 €
|
IEC 62271-202:2022High-voltage switchgear and controlgear - Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV
460.10 €
|

