The necessity of the study of 35kV transmission line cross cross load T tower and the design of single loop T tower jumper

Conference: ECITech 2022 - The 2022 International Conference on Electrical, Control and Information Technology
03/25/2022 - 03/27/2022 at Kunming, China

Proceedings: ECITech 2022

Pages: 3Language: englishTyp: PDF

Authors:
Li, Chu; Wang, Yuwei (Stata Grid Hebei Economic Research Institut, Shijiazhuang, Hebei, China)

Abstract:
With the rapid development of economy, people have higher and higher requirements for power reliability. In the current construction of 35kV transmission lines, in order to solve the problem of insufficient power supply reliability, there are more and more projects to transform the existing lines to increase access power supply. But T existing technology in general use to drill the first line and then to the twin towers single or twin towers double two-way connection way back, the T joint technology lever Kentucky number, project covers an area of more than, such problems as high construction cost and outage time is too long, to solve the above problems, this paper proposes a cross cross cross arm T connect way, better overcome the deficiency of the existing T connect way, The jumper of single loop cross cross T pole tower is designed to meet the practical engineering application.