Analysis of influencing factors of cost of new substation project based on complex information mining

Conference: ECITech 2022 - The 2022 International Conference on Electrical, Control and Information Technology
03/25/2022 - 03/27/2022 at Kunming, China

Proceedings: ECITech 2022

Pages: 3Language: englishTyp: PDF

Authors:
Wang, Hongjin; Zheng, Yan; Ji, Kailin; Xin, Cheng (State Grid Economic and Technological Research Institute Co., Ltd., Beijing, China)
Liu, Jinpeng (School of Economics and Management, North China Electric Power University, Beijing, China)
Ke, Ye (State Grid Fujian Economic Research Institute, Fuzhou, Fujian Province, China)

Abstract:
The scale of investment and construction of new substation projects is large, and there are many influencing factors in the construction process, which increases the difficulty of cost control of new substation projects to a certain extent. Therefore, combined with the statistical mining of the historical engineering information of the new substation project, this paper identifies and analyzes the influencing factors of the project cost, and provides a reference and basis for the power grid enterprises to improve the project cost control level and the project construction benefit level.