Draft:
PREORDER E DIN EN 50367/A2 VDE 0115-605/A2:2025-06Railways applications Fixed installations and rolling stock – Criteria to achieve technical compatibility between pantographs and overhead contact line; |
Draft:
NEW E DIN EN 50736 VDE 0831-736:2025-04Railway application Communication, signalling and processing system – Test requirements for signalling and telecommunication equipment; |
Standard:
DIN EN 50546 VDE 0115-546:2025-03Railway applications Rolling Stock – Three-phase shore (external) supply system for rail vehicles and its connectors; |
Standard:
DIN EN 50149 VDE 0115-602 Berichtigung 1:2025-03Railway applications Fixed installations – Electric traction – Copper and copper alloy grooved contact wires; |
Standard:
DIN EN 50617-1 VDE 0831-617-1:2025-02Railway applications – Technical parameters of train detection systems for the interoperability of the trans-European railway system Part 1: Track circuits; |
Draft:
E DIN EN IEC 62590-2-1 VDE 0115-590-21:2025-01Railway applications – Electronic power converters for fixed installations Part 2-1: DC Traction applications – Diode rectifiers |
Draft:
E DIN EN IEC 62590-2-2 VDE 0115-590-22:2025-01Railway applications – Electronic power converters for fixed installations Part 2-2: DC Applications – Controlled converters |
Draft:
E DIN EN 50122-1/A1 VDE 0115-3/A1:2024-12Fixed installations for railway applications – Electrical safety, earthing and the return circuit Part 1: Protective provisions against electric shock; |
Draft:
E DIN EN 50122-2/A1 VDE 0115-4/A1:2024-12Fixed installations for railway applications – Electrical safety, earthing and the return circuit Part 2: Provisions against the effects of stray currents caused by DC traction systems; |
Draft:
E DIN EN 50122-3/A1 VDE 0115-5/A1:2024-12Fixed installations for railway applications – Electrical safety, earthing and the return circuit Part 3: Mutual Interaction of AC and DC traction systems; |
Draft:
E DIN EN 50317 VDE 0115-503:2024-11Railway applications Current collection systems – Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line; |
Standard:
DIN CLC/TS 50641-2 VDE V 0115-641-2:2024-11Fixed Installations for Railway Applications – Requirements for the validation of simulation tools used for the design of electric traction power supply systems Part 2: specific DC urban case; |
Draft:
E DIN EN 50388-2 VDE 0115-606-2:2024-06Fixed installations and rolling stock for railway applications – Technical criteria for the coordination between electric traction power supply systems and rolling stock to achieve interoperability Part 2: Stability and harmonics; |
Draft:
E DIN EN 50728 VDE 0115-728:2024-04Railway applications Rolling stock – Testing for electromagnetic compatibility with track circuits; |
Draft:
E DIN EN 50617-2 VDE 0831-617-2:2024-04Railway applications – Technical parameters of train detection systems for the interoperability of the trans-European railway system Part 2: Axle counters; |
Standard:
DIN CLC/TS 50152-4 VDE V 0115-320-4:2024-01Railway applications – Fixed installations – Particular requirements for AC switchgear Part 4: AC metal-enclosed traction switchgear; |
Draft:
E DIN EN IEC 63453 VDE 0115-453:2023-11Railway applications – Current collection systems Validation of simulation of the dynamic interaction between pantograph and overhead contact line |
Draft:
E DIN EN 50126-1/A1 VDE 0115-103-1/A1:2023-07Railway Applications – The Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS) Part 1: Generic RAMS Process; |
Draft:
E DIN EN 50126-2/A1 VDE 0115-103-2/A1:2023-07Railway Applications – The Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS) Part 2: Systems Approach to Safety; |
Standard:
DIN EN 50119 VDE 0115-601 Berichtigung 1:2023-07Railway applications Fixed installations – Electric traction overhead contact lines; |