Cover IEC 61850-7-410:2012+AMD1:2015 CSV (Consolidated Version)
größer

IEC 61850-7-410:2012+AMD1:2015 CSV (Consolidated Version)

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Ausgabedatum: 2015-11
Edition: 2.1
Sprache: EN-FR - zweisprachig englisch/französisch
Seitenzahl: 284 VDE-Artnr.: 222276

Inhaltsverzeichnis

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.