Primary Control Reserve and Self-Sufficiency Provision with Central Battery Energy Storage System

Konferenz: NEIS 2017 - Conference on Sustainable Energy Supply and Energy Storage Systems
21.09.2017 - 22.09.2017 in Hamburg, Deutschland

Tagungsband: NEIS 2017

Seiten: 7Sprache: EnglischTyp: PDF

Persönliche VDE-Mitglieder erhalten auf diesen Artikel 10% Rabatt

Autoren:
Tayyebi, Ali; Bletterie, Benoit; Kupzog, Friederich (AIT – Austrian Institute of Technology, Vienna, Austria)

Inhalt:
In this paper, a novel high-level multi-functional control scheme for multiple service provision with the central battery energy storage system is proposed. The integrated control scheme facilitates the simultaneous primary control reserve and self-sufficiency provision. Further functionalities such as set-points conflict resolution, storage system capacity allocation, state of charge estimation, state of charge balancing control and point of common coupling voltage control are realized. These functionalities operate on a generic battery energy storage system model introduced in this work. The controller performance is verified with an analysis of the simulation test cases.